Get Social With Us
North Hero – Grand Isle Drawbridge | News
19945
paged,page,page-id-19945,page-template,page-template-full_width,page-template-full_width-php,paged-2,page-paged-2,ajax_fade,page_not_loaded,,vertical_menu_enabled,vertical_menu_with_bg_image,select-child-theme-ver-1.0.0,select-theme-ver-3.2.1,wpb-js-composer js-comp-ver-4.12,vc_responsive
nhgi_bridge_full_1600x640px

The North Hero-Grand Isle Drawbridge project will be contracted following the Construction Manager / General Contractor (CMGC) process. The selected contractor for Phase 1 of the CMGC process is Cianbro Corporation.  A description of the CMGC process is listed within the Glossary Page of this website.

The HDR Engineering team has completed the final scoping report for the North Hero-Grand Isle drawbridge, which contains the preferred alternative for this bridge project: a new twin leaf bascule structure on the existing alignment (Alternative II – Option A). Read the full report here.

Page 2 of 3 123